Load check handoff note
What to send to an electrician or hire supplier
A short handoff checklist for temporary heaters, drying equipment, fans and portable AC load questions.
Safety boundary: this guide is for early planning only. It does not inspect hidden wiring, sign off an installation or replace a competent electrician.
Send assumptions, not guesses
Include the equipment labels, watts/amps, quantities, run time, what runs together, socket or circuit rating, and any extension-lead issues.
Add photos only where useful
Photos of labels, plugs, sockets, cable routes and consumer-unit labels can help a competent person understand the setup, but they do not replace inspection.
Keep the summary with the job
The load checker creates a copyable calculation tape so the manager, landlord, supplier or electrician can see exactly what was assumed.
Equipment next step: if the load plan is realistic, compare ventilation and air movement options and keep the calculation trail with your site notes.